37kW Perth City YHA, Perth, WA
PROJECT AT A GLANCE
Client | Perth City YHA, Perth, WA |
Task | 37 kW system |
Panels | 148x 250W Hanwha SolarOne polycrystalline modules |
Inverter | 2x 15kW SMA Tripower 15,000 TL Inverter |
Email: sales@regenpower.com
Call: 1800 073 436
Client | Perth City YHA, Perth, WA |
Task | 37 kW system |
Panels | 148x 250W Hanwha SolarOne polycrystalline modules |
Inverter | 2x 15kW SMA Tripower 15,000 TL Inverter |
Date | Oct 2017 |
Location | Perth City YHA, Perth, WA |
Task | 37 kW system |
The major load in the premises during summer is air-conditioning which coincides with the sunshine hours. After consultation with the management and assessing the roof space available, it was decided to install a 37kW Solar PV system which has the potential of generating about 120kWh (or units) per day. It was estimated that the solar power generation would offset approximately 30% of Perth City YHA´s annual electricity consumption with a simple payback period of 2,2 years.
[contact-form-7 id=”66941″ title=”Popup Quote NSW Google”]
[contact-form-7 id=”66940″ title=”Popup Quote NSW Facebook”]
[contact-form-7 id=”66939″ title=”Popup Quote QLD Google”]
[contact-form-7 id=”66938″ title=”Popup Quote QLD Facebook”]
[contact-form-7 id=”66937″ title=”Popup Quote SA Google”]
[contact-form-7 id=”66936″ title=”Popup Quote SA Facebook”]
[contact-form-7 id=”66927″ title=”Popup Quote WA Facebook”]
[contact-form-7 id=”66926″ title=”Popup Quote WA Google”]
[contact-form-7 id=”61105″ title=”Request a Quote SA”]